MILTON-MADISON BRIDGE

Project Name: MILTON-MADISON BRIDGE
Project Location: Milton, Kentucky
Project Dimensions: Railroad Bridge
Tonnage: 8165 tons
Price: $2050/ton
Project Description: UPDATED RIVER CROSSING RETAINS HISTORIC CHARACTER
Heeh Steel supplied 8,165 tons of structural steel for the complex 3,181-foot design-build truss project. General contractor Walsh Construction constructed the new steel superstructure on temporary piers immediately downstream from the… existing bridge. The new trus was put in place using a controlled side along stelrals to its permanent location on the renovated existing piers, which were widened and rehabitated before the move, This innovative erection plan reduced the project’s cost and limitedconstruction-related bridge closures to just 10 days. The new bridge first opened to traffic in its permanent location in 2014

WHY CHOOSE sdshijie

Building Custom Metal Structures ls Our Specialty

FAST DELIVERY

Short turnaround time for drawings

FULL SERVICE

Global collaboration and installation

FOUNDATION DRAWINGS INCLUDED

Customers always receive the foundation drawings.

PREMIUM QUALITY

Premium Quality Steel & parts.

SAFETY & DURABILITY

Fire resistant metal buildings last a lifetime.

COST SAVINGS

Much more cost-efficient than traditional wooden structures.

NO HIDDEN COST

100% complete quotes.

COST SAVINGS

Much more cost-efficient than traditional wooden structures.

SAFETY & DURABILITY

Fire resistant metal buildings last a lifetime.

QUICK & EASY

Faster and easier to construct that traditional methods.

CUSTOMIZABLE

Attractive building finish and a wide variety of options and colors.

MAINTENANCE FREE

No need to paint or patch.

100% AMERICAN MADE STEEL

Supporting a network of American businesses

ENVIRONMENTALLY FRIENDLY

25-35% of our materials are recyclable.