{"id":851,"date":"2025-12-06T08:28:35","date_gmt":"2025-12-06T08:28:35","guid":{"rendered":"https:\/\/sdshijie.com\/?p=851"},"modified":"2025-12-29T04:51:43","modified_gmt":"2025-12-29T04:51:43","slug":"milton-madison-bridge","status":"publish","type":"post","link":"https:\/\/sdshijie.com\/ms\/2025\/12\/06\/milton-madison-bridge\/","title":{"rendered":"Jambatan Milton-Madison"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Nama Projek: Jambatan Milton-Madison<br>Lokasi Projek: Milton, Kentucky<br>Dimensi Projek: Jambatan Keretapi<br>Tonnage: 8165 tan<br>Harga: $2050\/tan<br>Deskripsi Projek: Pembaharuan Penyeberangan Sungai Mengekalkan Ciri Sejarah<br>Heeh Steel membekalkan 8,165 tan keluli struktur untuk projek truss reka-bina kompleks setinggi 3,181 kaki. Kontraktor am Walsh Construction membina superstruktur keluli baharu di atas tiang sementara sejurus di hilir daripada\u2026 jambatan sedia ada. Truss baharu itu dipasang menggunakan sistem rel sisi terkawal ke lokasi kekal di atas tiang sedia ada yang telah diperbaharui, yang diperluas dan dibaik pulih sebelum pemindahan. Pelan pemasangan inovatif ini mengurangkan kos projek dan mengehadkan penutupan jambatan berkaitan pembinaan kepada hanya 10 hari. Jambatan baharu itu mula dibuka kepada trafik di lokasi kekal pada tahun 2014<\/p>","protected":false},"excerpt":{"rendered":"<p>Project Name: MILTON-MADISON BRIDGEProject Location: Milton, KentuckyProject Dimensions: Railroad BridgeTonnage: 8165 tonsPrice: $2050\/tonProject Description: UPDATED RIVER CROSSING RETAINS HISTORIC CHARACTERHeeh Steel supplied 8,165 tons of structural steel for the complex 3,181-foot design-build truss project. General contractor Walsh Construction constructed the new steel superstructure on temporary piers immediately downstream from the\u2026 existing bridge. The new trus [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2303,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-851","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case-solutions"],"acf":[],"_links":{"self":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/851","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/comments?post=851"}],"version-history":[{"count":2,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/851\/revisions"}],"predecessor-version":[{"id":2304,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/851\/revisions\/2304"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/media\/2303"}],"wp:attachment":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/media?parent=851"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/categories?post=851"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/tags?post=851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}