{"id":806,"date":"2025-12-06T08:09:38","date_gmt":"2025-12-06T08:09:38","guid":{"rendered":"https:\/\/sdshijie.com\/?p=806"},"modified":"2025-12-29T05:02:11","modified_gmt":"2025-12-29T05:02:11","slug":"the-national-exhibition-fair-center","status":"publish","type":"post","link":"https:\/\/sdshijie.com\/ms\/2025\/12\/06\/the-national-exhibition-fair-center\/","title":{"rendered":"Pusat Pameran dan Pertunjukan Kebangsaan"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Nama Projek: Pusat Pameran dan Pertunjukan Kebangsaan<br>Alamat Projek: Komun Xuan Canh, Dong Hoi, Mai Lam, Daerah Dong Anh, Hanoi<br>Saiz Projek: 120,000 m2<br>Tonnage: 7,500 tan<br>Harga: US$1,250\/tan<br>Deskripsi Projek: Projek ini adalah sebuah kompleks pameran peringkat kebangsaan seluas 120,000 m2 dan merupakan projek infrastruktur awam utama di Hanoi. Struktur utama menggunakan sistem struktur keluli ruang tidak teratur berjubin lebar (jumlah penggunaan keluli kira-kira 18,000 tan). Pembinaan terlebih dahulu menyiapkan projek asas tiang pancang tuang di tapak tugas berat dan asas cap tiang pancang (untuk memenuhi keperluan menahan beban ruang besar di tapak pameran). Selepas komponen keluli tidak teratur dihasilkan secara digital di kilang, ia diangkat dalam bahagian dan dipasang secara berperingkat melalui usaha terkoordinasi beberapa kren merayap besar. Penyokong sementara juga dipasang serentak untuk menstabilkan struktur ruang yang kompleks. Semasa pembinaan, teknologi BIM digunakan untuk mengawal ketepatan pemasangan nod tidak teratur. Setelah siap, ia akan merangkumi dewan pameran pelbagai saiz, kawasan persidangan antarabangsa dan kemudahan perkhidmatan sokongan, yang kebanyakannya akan menjadi tuan rumah acara berskala besar seperti pameran antarabangsa dan kemuncak perdagangan, serta mengambil kira fungsi gabungan pameran, rundingan dan perkhidmatan sokongan.<\/p>","protected":false},"excerpt":{"rendered":"<p>Project Name: The National Exhibition Fair CenterProject Address: Xuan Canh Commune, Dong Hoi, Mai Lam, Dong Anh District, HanoiProject Size: 120,000 m2Tonnage: 7,500 tonsPrice: US$1,250\/tonProject Description: This project is a 120,000 m2 national-level exhibition complex and a key public infrastructure project in Hanoi. The main structure adopts a large-span irregular spatial steel structure system (total [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2316,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-806","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case-solutions"],"acf":[],"_links":{"self":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/806","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/comments?post=806"}],"version-history":[{"count":2,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/806\/revisions"}],"predecessor-version":[{"id":2317,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/806\/revisions\/2317"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/media\/2316"}],"wp:attachment":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/media?parent=806"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/categories?post=806"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/tags?post=806"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}