{"id":799,"date":"2025-12-06T08:08:08","date_gmt":"2025-12-06T08:08:08","guid":{"rendered":"https:\/\/sdshijie.com\/?p=799"},"modified":"2025-12-29T05:03:33","modified_gmt":"2025-12-29T05:03:33","slug":"large-enclosed-arched-coal-storage-shed-in-karaganda-mining-area","status":"publish","type":"post","link":"https:\/\/sdshijie.com\/ms\/2025\/12\/06\/large-enclosed-arched-coal-storage-shed-in-karaganda-mining-area\/","title":{"rendered":"Large Enclosed Arched Coal Storage Shed in Karaganda Mining Area"},"content":{"rendered":"<p>Project Name: Large Enclosed Arched Coal Storage Shed in Karaganda Mining Area<br>Project Address: Yard No. 5, Eastern Coal Industrial Park, Karaganda, Kazakhstan<br>Project Size: 24,000 square meters<br>Tonnage: 1,200 tons<br>Price: US$750\/ton<br>Project Description: This project is an enclosed coal storage facility with a total storage capacity of approximately 150,000 tons. The main structure adopts a large-span arched space frame structure (total steel consumption approximately 6,200 tons). Construction begins with the completion of the heavy-duty reinforced concrete foundation (suitable for coal stacking requirements). The space frame components are prefabricated in the factory and then hoisted and assembled section by section using crawler cranes. Temporary supports are installed simultaneously to ensure the stability of the arched structure. Upon completion, it will achieve enclosed coal storage, equipped with dust suppression spraying and ventilation systems, meeting the environmental protection and operational requirements of coal turnover storage in the mining area.<\/p>","protected":false},"excerpt":{"rendered":"<p>Project Name: Large Enclosed Arched Coal Storage Shed in Karaganda Mining AreaProject Address: Yard No. 5, Eastern Coal Industrial Park, Karaganda, KazakhstanProject Size: 24,000 square metersTonnage: 1,200 tonsPrice: US$750\/tonProject Description: This project is an enclosed coal storage facility with a total storage capacity of approximately 150,000 tons. The main structure adopts a large-span arched space [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2319,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-799","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case-solutions"],"acf":[],"_links":{"self":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/799","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/comments?post=799"}],"version-history":[{"count":2,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/799\/revisions"}],"predecessor-version":[{"id":2320,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/799\/revisions\/2320"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/media\/2319"}],"wp:attachment":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/media?parent=799"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/categories?post=799"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/tags?post=799"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}