{"id":784,"date":"2025-12-06T08:04:20","date_gmt":"2025-12-06T08:04:20","guid":{"rendered":"https:\/\/sdshijie.com\/?p=784"},"modified":"2025-12-29T05:06:03","modified_gmt":"2025-12-29T05:06:03","slug":"cam-ranh-international-airport-project","status":"publish","type":"post","link":"https:\/\/sdshijie.com\/ms\/2025\/12\/06\/cam-ranh-international-airport-project\/","title":{"rendered":"Cam Ranh International Airport Project"},"content":{"rendered":"<p>Project Name: Cam Ranh International Airport<\/p>\n\n\n\n<p>Project Address: Khanh Hoa, Vietnam<\/p>\n\n\n\n<p>Project Size: 51,000 m2<\/p>\n\n\n\n<p>Tonnage: 9,500 ton (2)<\/p>\n\n\n\n<p>Price: US$750\/ton<\/p>\n\n\n\n<p>Project Introduction: The construction of the 51,000\u33a1 terminal building of Nha Trang International Airport (Khanh Hoa Province, Vietnam) focuses on a large-span spatial steel structure: First, the pile foundation + pier foundation engineering is completed. After the 9,500 tons of steel components are prefabricated in the factory in different areas, the main truss is hoisted in sections by a large crane. Temporary supports are set up at the same time to ensure the stability of the large-span structure. After the steel structure is completed, the metal roofing system is laid. During the construction, the pre-embedding and installation of supporting facilities such as baggage handling and electromechanical pipelines of the terminal building are interspersed. The entire process follows the special specifications for wind resistance and heavy load of airport buildings. The construction is carried out in a flow-line manner in different areas to improve the efficiency of the operation.<\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Project Name: Cam Ranh International Airport Project Address: Khanh Hoa, Vietnam Project Size: 51,000 m2 Tonnage: 9,500 ton (2) Price: US$750\/ton Project Introduction: The construction of the 51,000\u33a1 terminal building of Nha Trang International Airport (Khanh Hoa Province, Vietnam) focuses on a large-span spatial steel structure: First, the pile foundation + pier foundation engineering is [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2321,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-784","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case-solutions"],"acf":[],"_links":{"self":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/784","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/comments?post=784"}],"version-history":[{"count":3,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/784\/revisions"}],"predecessor-version":[{"id":2323,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/784\/revisions\/2323"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/media\/2321"}],"wp:attachment":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/media?parent=784"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/categories?post=784"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/tags?post=784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}