{"id":784,"date":"2025-12-06T08:04:20","date_gmt":"2025-12-06T08:04:20","guid":{"rendered":"https:\/\/sdshijie.com\/?p=784"},"modified":"2025-12-29T05:06:03","modified_gmt":"2025-12-29T05:06:03","slug":"cam-ranh-international-airport-project","status":"publish","type":"post","link":"https:\/\/sdshijie.com\/ms\/2025\/12\/06\/cam-ranh-international-airport-project\/","title":{"rendered":"Projek Lapangan Terbang Antarabangsa Cam Ranh"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Nama Projek: Lapangan Terbang Antarabangsa Cam Ranh<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Alamat Projek: Khanh Hoa, Vietnam<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Saiz Projek: 51,000 m2<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Tonnage: 9,500 tan (2)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Harga: US$750\/tan<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pengenalan Projek: Pembinaan bangunan terminal seluas 51,000 m\u00b2 di Lapangan Terbang Antarabangsa Nha Trang (Provinsi Khanh Hoa, Vietnam) menumpukan pada struktur keluli ruang berkisaran lebar: Pertama, kejuruteraan asas tiang pancang + asas tiang telah disiapkan. Selepas komponen keluli seberat 9,500 tan prefabrikasi di kilang di kawasan berbeza, truss utama diangkat secara berperingkat oleh kren besar. Sokongan sementara dipasang pada masa yang sama untuk memastikan kestabilan struktur berkisaran luas. Selepas struktur keluli siap, sistem bumbung logam dipasang. Semasa pembinaan, kerja pendahuluan dan pemasangan kemudahan sokongan seperti pengendalian bagasi dan saluran paip elektromekanikal bangunan terminal dilakukan secara berselang-seli. Keseluruhan proses mematuhi spesifikasi khas untuk ketahanan angin dan beban berat bangunan lapangan terbang. Pembinaan dijalankan secara aliran-garis di kawasan yang berbeza untuk meningkatkan kecekapan operasi.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Project Name: Cam Ranh International Airport Project Address: Khanh Hoa, Vietnam Project Size: 51,000 m2 Tonnage: 9,500 ton (2) Price: US$750\/ton Project Introduction: The construction of the 51,000\u33a1 terminal building of Nha Trang International Airport (Khanh Hoa Province, Vietnam) focuses on a large-span spatial steel structure: First, the pile foundation + pier foundation engineering is [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2321,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-784","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case-solutions"],"acf":[],"_links":{"self":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/784","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/comments?post=784"}],"version-history":[{"count":3,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/784\/revisions"}],"predecessor-version":[{"id":2323,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/784\/revisions\/2323"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/media\/2321"}],"wp:attachment":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/media?parent=784"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/categories?post=784"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/tags?post=784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}