{"id":209,"date":"2025-12-03T09:44:04","date_gmt":"2025-12-03T09:44:04","guid":{"rendered":"https:\/\/sdshijie.com\/?p=209"},"modified":"2025-12-29T00:49:53","modified_gmt":"2025-12-29T00:49:53","slug":"cainiao-smart-logistics","status":"publish","type":"post","link":"https:\/\/sdshijie.com\/ms\/2025\/12\/03\/cainiao-smart-logistics\/","title":{"rendered":"Logistik Pintar Cainiao"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><strong>Nama Projek:<\/strong>&nbsp;Logistik Pintar Cainiao<br><strong>Lokasi Projek:<\/strong>&nbsp;Dong Nai, Vietnam<br><strong>Dimensi Projek:<\/strong>&nbsp;800*300*9 (80,000 m\u00b2 kawasan keseluruhan)<br><strong>Tona:<\/strong>&nbsp;400 tan<br><strong>Petikan:<\/strong>&nbsp;750 USD\/tan<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pengenalan Projek:<\/strong><br>Ini adalah projek pembinaan pusat logistik pintar moden yang meliputi kawasan seluas 80,000 m\u00b2. Projek ini menggunakan sistem struktur keluli rentangan lebar, terdiri daripada beberapa bangunan yang direka untuk fungsi penyimpanan dan pengsortiran. Susun atur struktur keseluruhan menggunakan susunan bent berbilang unit 800+300+9 meter untuk memenuhi keperluan operasi ruang logistik besar tanpa tiang.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Semasa proses pembinaan, kira-kira 400 tan keluli telah digunakan, terutamanya terdiri daripada tiang keluli, rasuk, komponen penyokongan, dan sistem bumbung. Tapak pembinaan diatur mengikut zon untuk kemajuan berperingkat, dengan gudang pengasingan dan kawasan pengedaran maju serentak bagi memastikan pemasangan struktur utama dapat disiapkan dengan pantas dalam jadual yang ketat.<\/p>","protected":false},"excerpt":{"rendered":"<p>Project Name:&nbsp;Cainiao Smart LogisticsProject Location:&nbsp;Dong Nai, VietnamProject Dimensions:&nbsp;800*300*9 (80,000 m\u00b2 total area)Tonnage:&nbsp;400 tonsQuotation:&nbsp;750 USD\/ton Project Introduction:This is a modern smart logistics center construction project covering an area of 80,000 m\u00b2. The project utilizes a large-span steel structure system, consisting of multiple buildings designed for storage and sorting functions. The overall structural layout adopts a multi-unit [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2269,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-209","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case-solutions"],"acf":[],"_links":{"self":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/209","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/comments?post=209"}],"version-history":[{"count":2,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/209\/revisions"}],"predecessor-version":[{"id":2271,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/posts\/209\/revisions\/2271"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/media\/2269"}],"wp:attachment":[{"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/media?parent=209"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/categories?post=209"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sdshijie.com\/ms\/wp-json\/wp\/v2\/tags?post=209"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}