{"id":210,"date":"2025-12-03T09:44:51","date_gmt":"2025-12-03T09:44:51","guid":{"rendered":"https:\/\/sdshijie.com\/?p=210"},"modified":"2025-12-29T01:11:00","modified_gmt":"2025-12-29T01:11:00","slug":"camso-loadstar","status":"publish","type":"post","link":"https:\/\/sdshijie.com\/ja\/2025\/12\/03\/camso-loadstar\/","title":{"rendered":"Camso Loadstar"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><strong>\u30d7\u30ed\u30b8\u30a7\u30af\u30c8\u540d<\/strong>&nbsp;Camso Loadstar<br><strong>Project Location:<\/strong>&nbsp;Sri Lanka<br><strong>\u30d7\u30ed\u30b8\u30a7\u30af\u30c8\u306e\u5bf8\u6cd5\uff1a<\/strong>&nbsp;700*1200*10<br><strong>\u30c8\u30f3\u6570\uff1a<\/strong>&nbsp;2,800 tons<br><strong>\u5f15\u7528<\/strong>&nbsp;750\u7c73\u30c9\u30eb\/\u30c8\u30f3<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>\u30d7\u30ed\u30b8\u30a7\u30af\u30c8\u7d39\u4ecb\uff1a<\/strong><br>Located in a key industrial zone of Sri Lanka, this project is a modern light steel structure workshop built using a portal frame system. The building features large-span, practical spaces achieved through efficient assembly processes, combining structural stability with excellent weather resistance. The project is currently progressing systematically, with construction focused on erecting the main framework and installing the building envelope. Upon completion, it will empower the development of local manufacturing, enhance the regional industrial infrastructure, and serve as a vital facility for boosting industrial capacity.<\/p>","protected":false},"excerpt":{"rendered":"<p>Project Name:&nbsp;Camso LoadstarProject Location:&nbsp;Sri LankaProject Dimensions:&nbsp;700*1200*10Tonnage:&nbsp;2,800 tonsQuotation:&nbsp;750 USD\/ton Project Introduction:Located in a key industrial zone of Sri Lanka, this project is a modern light steel structure workshop built using a portal frame system. The building features large-span, practical spaces achieved through efficient assembly processes, combining structural stability with excellent weather resistance. The project is currently progressing systematically, with construction focused on erecting the main framework and installing the building envelope. Upon completion, it will empower the development of local manufacturing, enhance the regional industrial infrastructure, and serve as a vital facility for boosting industrial capacity.<\/p>","protected":false},"author":1,"featured_media":2274,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-210","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case-solutions"],"acf":[],"_links":{"self":[{"href":"https:\/\/sdshijie.com\/ja\/wp-json\/wp\/v2\/posts\/210","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdshijie.com\/ja\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sdshijie.com\/ja\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ja\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ja\/wp-json\/wp\/v2\/comments?post=210"}],"version-history":[{"count":2,"href":"https:\/\/sdshijie.com\/ja\/wp-json\/wp\/v2\/posts\/210\/revisions"}],"predecessor-version":[{"id":2276,"href":"https:\/\/sdshijie.com\/ja\/wp-json\/wp\/v2\/posts\/210\/revisions\/2276"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/ja\/wp-json\/wp\/v2\/media\/2274"}],"wp:attachment":[{"href":"https:\/\/sdshijie.com\/ja\/wp-json\/wp\/v2\/media?parent=210"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sdshijie.com\/ja\/wp-json\/wp\/v2\/categories?post=210"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sdshijie.com\/ja\/wp-json\/wp\/v2\/tags?post=210"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}