{"id":751,"date":"2025-12-06T07:54:09","date_gmt":"2025-12-06T07:54:09","guid":{"rendered":"https:\/\/sdshijie.com\/?p=751"},"modified":"2025-12-29T04:42:05","modified_gmt":"2025-12-29T04:42:05","slug":"hailide-factory-phuoc-dong-industrial-park","status":"publish","type":"post","link":"https:\/\/sdshijie.com\/fr\/2025\/12\/06\/hailide-factory-phuoc-dong-industrial-park\/","title":{"rendered":"Usine Hailide, parc industriel de Phuoc Dong"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Nom du projet : Usine Hailide, parc industriel de Phuoc Dong<br>Adresse du projet : Province de Tay Ninh, Vietnam<br>Superficie du projet : 17 468 m\u00b2<br>Tonnage : 1 200 tonnes<br>Prix : 750 USD\/tonne<br>Description du projet : L'usine Hailide Vietnam, une usine \u00e0 unit\u00e9 unique (17 468 m\u00b2), utilise un syst\u00e8me de structure m\u00e9tallique \u00e0 portique. La construction a d\u00e9but\u00e9 en 2019 et s'est achev\u00e9e en 2020. La structure principale se compose d'une fondation ind\u00e9pendante en b\u00e9ton arm\u00e9 et d'une ossature m\u00e9tallique l\u00e9g\u00e8re. Le toit est \u00e9quip\u00e9 d'un syst\u00e8me de couverture en t\u00f4le profil\u00e9e, et les murs ext\u00e9rieurs sont recouverts de panneaux m\u00e9talliques composites ray\u00e9s noirs, blancs et gris (adapt\u00e9s \u00e0 la ventilation et \u00e0 la dissipation de la chaleur dans les climats tropicaux). La construction a adopt\u00e9 un mode de pr\u00e9fabrication modulaire + assemblage sur site afin de raccourcir le cycle. La zone sur\u00e9lev\u00e9e du rez-de-chauss\u00e9e et les installations publiques pr\u00e9-encastr\u00e9es ainsi que d'autres travaux de soutien ont \u00e9t\u00e9 r\u00e9alis\u00e9s simultan\u00e9ment, conform\u00e9ment aux codes de construction industriels vietnamiens.<\/p>","protected":false},"excerpt":{"rendered":"<p>Project Name: Hailide Factory, Phuoc Dong Industrial ParkProject Address: Tay Ninh Province, VietnamProject Size: 17,468 m2Tonnage: 1200 tonsPrice: USD 750\/tonProject Description: The Hailide Vietnam factory, a single-unit plant (17,468 m2), utilizes a portal frame steel structure system. Construction began in 2019 and was completed in 2020. The main structure consists of a reinforced concrete independent [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":752,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-751","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case-solutions"],"acf":[],"_links":{"self":[{"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/posts\/751","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/comments?post=751"}],"version-history":[{"count":3,"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/posts\/751\/revisions"}],"predecessor-version":[{"id":2284,"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/posts\/751\/revisions\/2284"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/media\/752"}],"wp:attachment":[{"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/media?parent=751"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/categories?post=751"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/tags?post=751"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}