{"id":209,"date":"2025-12-03T09:44:04","date_gmt":"2025-12-03T09:44:04","guid":{"rendered":"https:\/\/sdshijie.com\/?p=209"},"modified":"2025-12-29T00:49:53","modified_gmt":"2025-12-29T00:49:53","slug":"cainiao-smart-logistics","status":"publish","type":"post","link":"https:\/\/sdshijie.com\/fr\/2025\/12\/03\/cainiao-smart-logistics\/","title":{"rendered":"Cainiao Smart Logistics"},"content":{"rendered":"<p><strong>Nom du projet :<\/strong>&nbsp;Cainiao Smart Logistics<br><strong>Emplacement du projet :<\/strong>&nbsp;Dong Nai, Vietnam<br><strong>Dimensions du projet :<\/strong>&nbsp;800*300*9 (superficie totale de 80 000 m\u00b2)<br><strong>Tonnage :<\/strong>&nbsp;400 tonnes<br><strong>Citation :<\/strong>&nbsp;750 USD\/tonne<\/p>\n\n\n\n<p><strong>Pr\u00e9sentation du projet :<\/strong><br>Il s'agit d'un projet de construction d'un centre logistique intelligent moderne d'une superficie de 80 000 m\u00b2. Le projet utilise un syst\u00e8me de structure m\u00e9tallique \u00e0 grande port\u00e9e, compos\u00e9 de plusieurs b\u00e2timents con\u00e7us pour des fonctions de stockage et de tri. La disposition structurelle globale adopte une configuration courb\u00e9e \u00e0 plusieurs unit\u00e9s de 800+300+9 m\u00e8tres afin de r\u00e9pondre aux exigences op\u00e9rationnelles des grands espaces logistiques sans colonnes.<\/p>\n\n\n\n<p>Au cours du processus de construction, environ 400 tonnes d'acier ont \u00e9t\u00e9 utilis\u00e9es, principalement pour les colonnes, les poutres, les \u00e9l\u00e9ments de renfort et les syst\u00e8mes de toiture. Le chantier a \u00e9t\u00e9 organis\u00e9 en zones pour permettre une progression par \u00e9tapes, les entrep\u00f4ts de tri et les zones de distribution avan\u00e7ant simultan\u00e9ment afin de garantir une installation rapide de la structure principale dans un d\u00e9lai serr\u00e9.<\/p>","protected":false},"excerpt":{"rendered":"<p>Project Name:&nbsp;Cainiao Smart LogisticsProject Location:&nbsp;Dong Nai, VietnamProject Dimensions:&nbsp;800*300*9 (80,000 m\u00b2 total area)Tonnage:&nbsp;400 tonsQuotation:&nbsp;750 USD\/ton Project Introduction:This is a modern smart logistics center construction project covering an area of 80,000 m\u00b2. The project utilizes a large-span steel structure system, consisting of multiple buildings designed for storage and sorting functions. The overall structural layout adopts a multi-unit [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2269,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-209","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case-solutions"],"acf":[],"_links":{"self":[{"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/posts\/209","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/comments?post=209"}],"version-history":[{"count":2,"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/posts\/209\/revisions"}],"predecessor-version":[{"id":2271,"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/posts\/209\/revisions\/2271"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/media\/2269"}],"wp:attachment":[{"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/media?parent=209"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/categories?post=209"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sdshijie.com\/fr\/wp-json\/wp\/v2\/tags?post=209"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}