{"id":751,"date":"2025-12-06T07:54:09","date_gmt":"2025-12-06T07:54:09","guid":{"rendered":"https:\/\/sdshijie.com\/?p=751"},"modified":"2025-12-29T04:42:05","modified_gmt":"2025-12-29T04:42:05","slug":"hailide-factory-phuoc-dong-industrial-park","status":"publish","type":"post","link":"https:\/\/sdshijie.com\/es\/2025\/12\/06\/hailide-factory-phuoc-dong-industrial-park\/","title":{"rendered":"F\u00e1brica Hailide, Parque Industrial Phuoc Dong"},"content":{"rendered":"<p>Nombre del proyecto: F\u00e1brica Hailide, Parque Industrial Phuoc Dong<br>Direcci\u00f3n del proyecto: Provincia de Tay Ninh, Vietnam<br>Superficie del proyecto: 17 468 m2<br>Tonelaje: 1200 toneladas<br>Precio: 750 d\u00f3lares estadounidenses por tonelada.<br>Descripci\u00f3n del proyecto: La f\u00e1brica de Hailide Vietnam, una planta de una sola unidad (17 468 m\u00b2), utiliza un sistema de estructura de acero con p\u00f3rticos. La construcci\u00f3n comenz\u00f3 en 2019 y se complet\u00f3 en 2020. La estructura principal consta de una cimentaci\u00f3n independiente de hormig\u00f3n armado y una estructura de acero ligero. El techo est\u00e1 equipado con un sistema de cubierta de chapa de acero perfilada, y las paredes exteriores utilizan paneles met\u00e1licos compuestos con rayas negras, blancas y grises (adecuados para la ventilaci\u00f3n y la disipaci\u00f3n del calor en climas tropicales). La construcci\u00f3n adopt\u00f3 un modo de prefabricaci\u00f3n modular + montaje in situ para acortar el ciclo. La zona elevada de la planta baja y las instalaciones p\u00fablicas preinstaladas y otras obras de apoyo se completaron simult\u00e1neamente, cumpliendo con los c\u00f3digos de construcci\u00f3n industrial vietnamitas.<\/p>","protected":false},"excerpt":{"rendered":"<p>Project Name: Hailide Factory, Phuoc Dong Industrial ParkProject Address: Tay Ninh Province, VietnamProject Size: 17,468 m2Tonnage: 1200 tonsPrice: USD 750\/tonProject Description: The Hailide Vietnam factory, a single-unit plant (17,468 m2), utilizes a portal frame steel structure system. Construction began in 2019 and was completed in 2020. The main structure consists of a reinforced concrete independent [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":752,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-751","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case-solutions"],"acf":[],"_links":{"self":[{"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/posts\/751","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/comments?post=751"}],"version-history":[{"count":3,"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/posts\/751\/revisions"}],"predecessor-version":[{"id":2284,"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/posts\/751\/revisions\/2284"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/media\/752"}],"wp:attachment":[{"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/media?parent=751"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/categories?post=751"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/tags?post=751"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}