{"id":209,"date":"2025-12-03T09:44:04","date_gmt":"2025-12-03T09:44:04","guid":{"rendered":"https:\/\/sdshijie.com\/?p=209"},"modified":"2025-12-29T00:49:53","modified_gmt":"2025-12-29T00:49:53","slug":"cainiao-smart-logistics","status":"publish","type":"post","link":"https:\/\/sdshijie.com\/es\/2025\/12\/03\/cainiao-smart-logistics\/","title":{"rendered":"Cainiao Log\u00edstica Inteligente"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><strong>Nombre del proyecto:<\/strong>&nbsp;Cainiao Log\u00edstica Inteligente<br><strong>Ubicaci\u00f3n del proyecto:<\/strong>&nbsp;Dong Nai, Vietnam<br><strong>Dimensiones del proyecto:<\/strong>&nbsp;800 \u00d7 300 \u00d7 9 (80 000 m\u00b2 de superficie total)<br><strong>Tonelaje:<\/strong>&nbsp;400 toneladas<br><strong>Cita:<\/strong>&nbsp;750 USD\/tonelada<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Presentaci\u00f3n del proyecto:<\/strong><br>Se trata de un proyecto de construcci\u00f3n de un moderno centro log\u00edstico inteligente con una superficie de 80 000 m\u00b2. El proyecto utiliza un sistema de estructura de acero de gran luz, compuesto por varios edificios dise\u00f1ados para funciones de almacenamiento y clasificaci\u00f3n. La disposici\u00f3n estructural general adopta una configuraci\u00f3n de vigas de gran luz de 800+300+9 metros para satisfacer las exigencias operativas de los grandes espacios log\u00edsticos sin columnas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Durante el proceso de construcci\u00f3n se utilizaron aproximadamente 400 toneladas de acero, compuestas principalmente por columnas, vigas, elementos de arriostramiento y sistemas de cubierta. La obra se organiz\u00f3 en zonas para avanzar por fases, y los almacenes de clasificaci\u00f3n y las \u00e1reas de distribuci\u00f3n se desarrollaron simult\u00e1neamente para garantizar la r\u00e1pida instalaci\u00f3n de la estructura principal dentro de un calendario muy ajustado.<\/p>","protected":false},"excerpt":{"rendered":"<p>Project Name:&nbsp;Cainiao Smart LogisticsProject Location:&nbsp;Dong Nai, VietnamProject Dimensions:&nbsp;800*300*9 (80,000 m\u00b2 total area)Tonnage:&nbsp;400 tonsQuotation:&nbsp;750 USD\/ton Project Introduction:This is a modern smart logistics center construction project covering an area of 80,000 m\u00b2. The project utilizes a large-span steel structure system, consisting of multiple buildings designed for storage and sorting functions. The overall structural layout adopts a multi-unit [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2269,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-209","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case-solutions"],"acf":[],"_links":{"self":[{"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/posts\/209","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/comments?post=209"}],"version-history":[{"count":2,"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/posts\/209\/revisions"}],"predecessor-version":[{"id":2271,"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/posts\/209\/revisions\/2271"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/media\/2269"}],"wp:attachment":[{"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/media?parent=209"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/categories?post=209"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sdshijie.com\/es\/wp-json\/wp\/v2\/tags?post=209"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}