{"id":784,"date":"2025-12-06T08:04:20","date_gmt":"2025-12-06T08:04:20","guid":{"rendered":"https:\/\/sdshijie.com\/?p=784"},"modified":"2025-12-29T05:06:03","modified_gmt":"2025-12-29T05:06:03","slug":"cam-ranh-international-airport-project","status":"publish","type":"post","link":"https:\/\/sdshijie.com\/de\/2025\/12\/06\/cam-ranh-international-airport-project\/","title":{"rendered":"Projekt zum internationalen Flughafen Cam Ranh"},"content":{"rendered":"<p>Projektname: Internationaler Flughafen Cam Ranh<\/p>\n\n\n\n<p>Projektadresse: Khanh Hoa, Vietnam<\/p>\n\n\n\n<p>Projektgr\u00f6\u00dfe: 51.000 m2<\/p>\n\n\n\n<p>Tonnage: 9.500 Tonnen (2)<\/p>\n\n\n\n<p>Preis: 1.075 US-Dollar\/Tonne<\/p>\n\n\n\n<p>Einf\u00fchrung in das Projekt: Der Bau des 51.000\u33a1 gro\u00dfen Terminalgeb\u00e4udes des internationalen Flughafens Nha Trang (Provinz Khanh Hoa, Vietnam) konzentriert sich auf eine gro\u00dffl\u00e4chige Stahlkonstruktion: Zun\u00e4chst wird die Pfahlgr\u00fcndung und die Pfeilergr\u00fcndung durchgef\u00fchrt. Nachdem die 9.500 Tonnen Stahlbauteile in der Fabrik in verschiedenen Bereichen vorgefertigt wurden, wird das Haupttragwerk in Abschnitten mit einem gro\u00dfen Kran hochgezogen. Gleichzeitig werden provisorische St\u00fctzen aufgestellt, um die Stabilit\u00e4t der gro\u00dffl\u00e4chigen Struktur zu gew\u00e4hrleisten. Nach Fertigstellung der Stahlkonstruktion wird das Metalldachsystem verlegt. W\u00e4hrend der Bauarbeiten werden die Voreinbauten und die Installation der Nebenanlagen wie Gep\u00e4ckabfertigung und elektromechanische Rohrleitungen des Terminalgeb\u00e4udes durchgef\u00fchrt. Der gesamte Prozess folgt den speziellen Spezifikationen f\u00fcr Windwiderstand und schwere Lasten von Flughafengeb\u00e4uden. Der Bau wird in verschiedenen Bereichen flie\u00dfend durchgef\u00fchrt, um die Effizienz des Betriebs zu verbessern.<\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Project Name: Cam Ranh International Airport Project Address: Khanh Hoa, Vietnam Project Size: 51,000 m2 Tonnage: 9,500 ton (2) Price: US$750\/ton Project Introduction: The construction of the 51,000\u33a1 terminal building of Nha Trang International Airport (Khanh Hoa Province, Vietnam) focuses on a large-span spatial steel structure: First, the pile foundation + pier foundation engineering is [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2321,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-784","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case-solutions"],"acf":[],"_links":{"self":[{"href":"https:\/\/sdshijie.com\/de\/wp-json\/wp\/v2\/posts\/784","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdshijie.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sdshijie.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/de\/wp-json\/wp\/v2\/comments?post=784"}],"version-history":[{"count":3,"href":"https:\/\/sdshijie.com\/de\/wp-json\/wp\/v2\/posts\/784\/revisions"}],"predecessor-version":[{"id":2323,"href":"https:\/\/sdshijie.com\/de\/wp-json\/wp\/v2\/posts\/784\/revisions\/2323"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sdshijie.com\/de\/wp-json\/wp\/v2\/media\/2321"}],"wp:attachment":[{"href":"https:\/\/sdshijie.com\/de\/wp-json\/wp\/v2\/media?parent=784"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sdshijie.com\/de\/wp-json\/wp\/v2\/categories?post=784"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sdshijie.com\/de\/wp-json\/wp\/v2\/tags?post=784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}