Churchill River Bridge

Project Name: Churchill River Bridge
Project Location: Goose Bay, New Brunswick, Canada
Project Dimensions:
Tonnage: 1500 tons
Price: US$1450/ton
Project Description: This bridge across the Churchill River connects Labrador to the rest of Canada (via Quebec). Completed on an accelerated schedule in 2006, the 360-meter-long bridge consists of three 120-meter-long sections.

WHY CHOOSE sdshijie

Building Custom Metal Structures ls Our Specialty

FAST DELIVERY

Short turnaround time for drawings

FULL SERVICE

Global collaboration and installation

FOUNDATION DRAWINGS INCLUDED

Customers always receive the foundation drawings.

PREMIUM QUALITY

Premium Quality Steel & parts.

SAFETY & DURABILITY

Fire resistant metal buildings last a lifetime.

COST SAVINGS

Much more cost-efficient than traditional wooden structures.

NO HIDDEN COST

100% complete quotes.

COST SAVINGS

Much more cost-efficient than traditional wooden structures.

SAFETY & DURABILITY

Fire resistant metal buildings last a lifetime.

QUICK & EASY

Faster and easier to construct that traditional methods.

CUSTOMIZABLE

Attractive building finish and a wide variety of options and colors.

MAINTENANCE FREE

No need to paint or patch.

100% AMERICAN MADE STEEL

Supporting a network of American businesses

ENVIRONMENTALLY FRIENDLY

25-35% of our materials are recyclable.